www.arbosurfboards.blogspot.com
Monday, 4 April 2011
keel stringers
the keel stringers are sitka spruce 35x45mm so we doubled up the 35x22 stringers that we use everywhere else by glueing them together with spabond. we found it easiest to do the glueing in situ. and instead of using a lot of clamps we hold the two 35x22s together with plastic nails whilst curing. the nice thing about the plastic nails is that they sand of really easy and it doesn’t matter if you cut them with a saw or plane. also they don’t corrode.
on the pictures below you can see the keelstringers after they were glued in and bevelled to receive the keel panels.
towards the stern of the hull the keel kicks up and meets the single longitudinal stringers that run parallel to the waterline.
Tuesday, 22 February 2011
tenby lugger
as a student at mitec, the marine technology center of pembrokeshire college, i was able to take part in the build of a replica of a tenby lugger. the boat is part of a project called rising tide which aims to promote maritime identity, history and opportunity across and between Wales and Ireland.
she will be larch on oak.
the keel is solid oak from the forest of dean on the welsh-english border. as the rough sawn log was to big to be handled in the machine shop of mitec we had to cut it by hand. good chance to try out a two man saw mitec tutor and head shipwright for the rising tide project colin evans had lying around in his workshop. although the teeth of the saw were set for crosscutting progress was made reasonably quick. and on a nice sunny day with enough men and women to take their turn it was fun. note the wedges stooping the saw blade from jamming in the cut.
the solid oak keel in front of the temporary building shed called ‘the lughole’.
my scottish friend alistair who lives back up north in Fochabers, Scotland and builds boats, snowboards, fine furniture and everything else you can make out of wood in the old workshop of ian ougthred! keep an eye out for “spey built”
boat builder/ teacher richard davies-scourfield enjoys using old tools…:
the final stroke:
and done.
Sunday, 19 December 2010
Wednesday, 8 December 2010
stringers
the stringers we use are all sitka spruce from robbins timber in bristol. they come in a lenght of ca. 5500mm ready machined to a thickness of 35x25mm and in good quality with very few defects and nice straight grain. we only have to thickness them down to 35x22mm and scarph them to the required length. before scarphing the lengths together we coat them in epoxy and round off the corners that are going to be facing inwards. doing this before scarphing makes handling much easier.
we find the quickest way to coat a lot of stringers at once is to clamp them flat together, apply resin with a roller or brush and take them apart once the epoxy is gelled so they do not get bonded together. don’t wait too long… we coat on face side (35mm) first, coat the opposite 35mm side, then round of the corners and do the rounded side at last. the second narrow side is left bare and gets a quick saturation coat before the planking sheets get glued on with spabond.
routering the corners where easy on a simple router table set up but even easier freehanded with this priceless little fella :
for the scarph joints we used a 1:12 ratio which were easily cut on the radial arm saw with a little jig.
clamping them together in a jig with spabond from sp systems…
…and out come enormous lengths of spruce …
…with a nearly invisible joint line.
shame that none of that wood will be seen in the finished boat…
Tuesday, 7 December 2010
our workshop
i wonder why the cops have not been here yet. a well insulated greenhouse, the light is on till late at night, owned by a dutchman… i would think some marihuana growing is happening there.
setting up bulkheads II
when we first set up the bulkheads we just located them on their correct position, in the right height and perpendicular to the centreline at the base. they were still able to lean for or backwards and to twist between sheer and keel line.
with a temporary keel we stopped the bulkheads from leaning and fixed them plum in position. the laser we used earlier to establish a centreline and to set the bulkheads level was helpful again.
on the picture above you can see the temporary keel in the middle and the sitka spruce keel stringers before they are glued in.
some of the bulkheads, specially the ones with a quite big cut out in the middle and therefore narrow at some places, were not stiff enough to remain straight under the load of the keelstringers. some bulkheads were slightly bowed because the flocoat cured whilst they were leaning against a wall and the epoxy fixed their slight bow. with the help of additional stringers on each side we straightened them up again.
we clamped the stringers in position and used laser, plum bob and tape measure to do fine adjustments until all bulkheads were straight and plum. in order not having to do all that again we marked the bulkhead locations on the stringers. when it came to glueing the stringers in place all we had to do was to get everything to the marked position.
to keep accessibility into the hull easy for a long time, we only glued in the stringers on one side of the hull and left the other side more or less open. you are going to see more of that in the next posts.
this is this weird guy who seems to be on a lot of the photographs i take of the building process. one of the rare pictures where he is wearing more than just the headphones and the glasses…