Tuesday, 22 February 2011

tenby lugger

luggerphoto

as a student at mitec, the marine technology center of pembrokeshire college, i was able to take part in the build of a replica of a tenby lugger. the boat is part of a project called rising tide which aims to promote maritime identity, history and opportunity across and between Wales and Ireland.

TenbyLugger1_000

she will be larch on oak.

the keel is solid oak from the forest of dean on the welsh-english border. as the rough sawn log was to big to be handled in the machine shop of mitec we had to cut it by hand. good chance to try out a two man saw mitec tutor and head shipwright for the rising tide project colin evans had lying around in his workshop. although the teeth of the saw were set for crosscutting progress was made reasonably quick. and on a nice sunny day with enough men and women to take their turn it was fun. note the wedges stooping the saw blade from jamming in the cut.

DSCN6955

the solid oak keel in front of the temporary building shed called ‘the lughole’.

DSCN6964

my scottish friend alistair who lives back up north in Fochabers, Scotland and builds boats, snowboards, fine furniture and everything else you can make out of wood in the old workshop of ian ougthred! keep an eye out for “spey built”

DSCN6935

boat builder/ teacher richard davies-scourfield enjoys using old tools…:

DSCN6947

the final stroke:

DSCN6959

and done.

DSCN6960

Wednesday, 8 December 2010

stringers

the stringers we use are all sitka spruce from robbins timber in bristol.  they come in a lenght of ca. 5500mm ready machined to a thickness of 35x25mm and in good quality with very few defects and nice straight grain.   we only have to thickness them down to 35x22mm and scarph them to the required length. before scarphing the lengths together we coat them in epoxy and round off the corners that are going to be facing inwards.  doing this before scarphing makes handling much easier.

DSCN7644

we find the quickest way to coat a lot of stringers at once is to clamp them flat together, apply resin with a roller or brush and take them apart once the epoxy is gelled so they do not get bonded together.  don’t wait too long… we coat on face side (35mm) first, coat the opposite 35mm side, then round of the corners and do the rounded side at last. the second narrow side is left bare and gets a quick saturation coat before the planking sheets get glued on with spabond.

DSCN7965

routering the corners where easy on a simple router table set up but even easier freehanded with this priceless little fella :

 DSCN8008

for the scarph joints we used a 1:12 ratio which were easily cut on the radial arm saw with a little jig.

DSCN7966

clamping them together in a jig with spabond from sp systemsDSCN7086

…and out come enormous lengths of spruce …DSCN7088

…with a nearly invisible joint line. DSCN7089

shame that none of that wood will be seen in the finished boat…

Tuesday, 7 December 2010

our workshop

i wonder why the cops have not been here yet. a well insulated greenhouse, the light is on till late at night, owned by a dutchman… i would think some marihuana growing is happening there. 

DSCN8144

setting up bulkheads II

when we first set up the bulkheads we just located them on their correct position, in the right height and perpendicular to the centreline at the base. they were still able to lean for or backwards and to twist between sheer and keel line.DSCN7071

with a temporary keel we stopped the bulkheads from leaning and fixed them plum in position. the laser we used earlier to establish a centreline and to set the bulkheads level was helpful again. DSCN7102

on the picture above you can see the temporary keel in the middle and the sitka spruce keel stringers before they are glued in.

some of the bulkheads, specially the ones with a quite big cut out in the middle and therefore narrow at some places, were not stiff enough to remain straight under the load of the keelstringers. some bulkheads were slightly bowed because the flocoat cured whilst they were leaning against a wall and the epoxy fixed their slight bow. with the help of additional stringers on each side we straightened them up again.

DSCN7099

we clamped the stringers in position and used laser, plum bob and tape measure to do fine adjustments until all bulkheads were straight and plum. in order not having to do all that again we marked the bulkhead locations on the stringers. when it came to glueing the stringers in place all we had to do was to get everything to the marked position.

DSCN7100

to keep accessibility into the hull easy for a long time, we only glued in the stringers on one side of the hull and left the other side more or less open. you are going to see more of that in the next posts.

DSCN7098

this is this weird guy who seems to be on a lot of the photographs i take of the building process. one of the rare pictures where he is wearing more than just the headphones and the glasses…

if you need some nice pottery, he is the man!

Saturday, 7 August 2010

setting up bulkheads

the first thing we did when we set up the bulkheads, was to locate their exact position fore and aft and mark it on the longitudinal members of the strongback perpendicular to the centreline. using a long tape measure prevented accumulative errors. with a little arrow and a second line we marked if the bulkhead was to be set forward or aft of the stationline.

DSCN6817 DSCN6818

we build the catamaran upside down and to keep everything level we had to rise most of the bulkheads as can be seen in the picture above. the two floats have a negative sheer so the highest point of the sheer is located somewhere amidships and not like in traditional hulls at the stem or transom. the station/bulkhead closest to this highest point we sat on the strongback which we assume the baseline. from the drawings we could then establish the height of the support risers for the remaining bulkheads.

DSCN6813

a quick and easy way to do this was to create slots from three strips of ply. the “sandwiched” layer of ply is cut to  the required height and the two face layers a bit oversized.  so the bulkhead can slide in this created slot and can be clamped or screwed in position.

 DSCN6824

all bulkheads had waterlines and centrelines cut by the cnc router at swallow boats so with the help of a laser it was easy to align them. at this stage we weren’t to worried about having the bulkheads fixed plum as we were using the stringers at a later stage to locate them in their correct position.

the steps to our workshop

DSCN7069

those are just the top steps…